In accordance with Bylaw 97-15, this permit is mandatory when an applicant must proceed to a road cut or any other form of alteration, or work in the right of way of a county road, in order to connect pipes for drinking water or sewers.
The permit is issued to the applicant’s name, however the labour must be done by a renowned contractor in order to insure that all rebuilding done to the county road is done according to standards.
Rebuilding of ditches, road sides, sidewalks or any other road structure by means of excavation, boring under the road, pass over by tunnelling, etc. are also regulated by this permit.
Permit fee: $100 non-refundable and a security deposit (see table) refundable to permit holder when labour is completed and approved by the foreman, after a 2-year period.
Ditch cut, including boring under a road going from the ditch
|
Fee: |
|
Gravel road cut, of 100% of the travelled portion, by 3 meters or less in width.
|
Fee: |
|
Asphalt road cut, of less than 50% of the travelled portion, by 3 meters or less in width.
|
Fee: |
|
Asphalt road cut, of more than 50% of the travelled portion, by 3 meters or less in width.
|
Fee: |
|





